This is the travertine that we are doing in the bath upstairs. 12x12 on the floor, 4x4 up the wall and topped with the trim, textured wall with light green paint! I can't wait until it's all done. Ryan's got a lot of work to do as in over 400 tiles to lay! It's going to be so nice.
Wednesday, March 10, 2010
Can't wait till this is done!
Posted by Laura at 9:09 PM 2 comments
Subscribe to:
Posts (Atom)
